Projects +
Maschinenhaus Schwabing

The gutting of the machine house has been completed and the construction work to transform the building is in full swing. The core of the concept is an innovative low-tech approach: the building is simply designed and operated with the natural resources of the outside space, without complex technical and maintenance-intensive solutions. ehret+klein is relying on cooperation with the Technical University of Munich and its subsidiary e+k upcycle, which specializes in sustainability.

Marketing
Maschinenhaus Schwabing
Commercial
Units
3
Sizes
673 - 3.274 m²
Form of distribution
Kauf & Miete
Uses
Büro, Gastronomie
Sales contact
Marco Ulivieri
Ehret+Klein AG

A building within a building

Following this period of interim use, the building will be carefully gutted and renovated. A table-like support structure will then be used to incorporate new floor slabs that will allow the building to be used as an open-plan and loft office – a building within a building, so to speak. Cafes and restaurants will be included to provide future users and the neighborhood with places to eat.

Would you like to take a look inside the historic building?
Then take our
digital tour and explore the power house.

Ehret+Klein AG

A building that breathes and thinks.

A sophisticated ventilation and heating system as well as partial air conditioning systems ensure the perfect working climate. Water circuits with minimal consumption, underfloor heating with individual room control and the heating of the fresh air flow for natural office ventilation via special convectors make the conversion of the listed building a sustainable showcase project.

Foto: Matze Ried

Foto: Matze Ried

Foto: Matze Ried

    Art and culture with broke.today

    broke.today is a Munich-based collective of street artists, designers, musicians, architects, craftsmen and creative professionals. They are reactivating the Maschinenhaus and transforming it into a temporary meeting place for art, culture, crafts, technology, and sports. ehret+klein is making the building available free of charge until probably mid-2022 and is providing financial support for the interim use project.

    Maschinenhaus Schwabing Key figures
    Location
    Munich
    Completion
    2024
    Use
    • Offices
    • Restaurants/bars/cafes
    Area (approx. BFG)
    4.421 m²
    Property area (approx.)
    3.150 m²
    Project status
    Under construction